Discraft ESP Scorch | Understable Distance Driver with S-Curve Flight
Discraft ESP Scorch | Understable Distance Driver with S-Curve Flight
SKU:ESCORCH-1
Low stock: 1 left
Couldn't load pickup availability
Discraft ESP Scorch – Understable Distance Driver
Built for players who want to master distance with a smooth, workable flight, the Discraft ESP Scorch is an understable distance driver known for its exceptional glide and signature S-curve flight path. It turns smoothly out of the hand, glides effortlessly down the fairway, and finishes with a reliable fade — giving you long, controlled drives and turnovers that cover serious ground. In premium ESP plastic, you get a tacky grip and durable construction that performs consistently in any weather condition. Available in Teal and Orange foil.
Flight Numbers
- Speed: 11 | Glide: 6 | Turn: -2 | Fade: 2
- Stability: 0.5 | Weight: 173–174g
- Plastic: ESP — tacky, durable, and consistent in all conditions
Available Foil Colors
- Teal
- Orange
Who Is the Scorch For?
The Scorch is a versatile distance driver for players of all skill levels. Beginners and developing players will love how its understable flight generates easy distance without needing a powerful arm, while experienced players can use it for precise turnovers, hyzerflips, and long anhyzer lines that hold and glide to the target. If you’re looking for a reliable, high-glide distance driver that works in a wide variety of situations, the ESP Scorch delivers.
Share
