Skip to product information
1 of 6

Discraft Z Scorch | Understable Distance Driver with S-Curve Flight

Discraft Z Scorch | Understable Distance Driver with S-Curve Flight

SKU:ZSCORCH

Low stock: 1 left

Regular price $17.99 USD
Regular price Sale price $17.99 USD
Sale Sold out
Quantity

Discraft Z Scorch – Understable Distance Driver

Precise control, long-distance potential, and a signature S-curve flight. The Discraft Z Scorch is an understable distance driver that excels at executing smooth turnovers, hyzerflips, and sweeping S-curve shots that cover maximum ground. Made from durable Z plastic, this disc offers a firm feel and consistent performance in any condition — holding its flight characteristics round after round, season after season.

Flight Numbers

  • Speed: 11 | Glide: 6 | Turn: -2 | Fade: 2
  • Stability: 0.5 | Weight: 170–172g
  • Plastic: Z — durable, firm, translucent, and slow to season

Who Is the Z Scorch For?

The Z Scorch is a versatile distance driver for players of all skill levels. Beginners and developing players will find it easy to achieve impressive distance thanks to its understable flight and high Glide 6 rating — the disc does the work for you. Experienced players can use it for precise turnovers, hyzerflips that hold straight, and long anhyzer lines that glide effortlessly to the target. The Z plastic version seasons gradually, making it a long-lasting addition to any bag that gets better with time.

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Discraft Z Scorch | Understable Distance Driver with S-Curve Flight
Discraft Z Scorch | Understable Distance Driver with S-Curve FlightZSCORCH
Discraft Z Scorch | Understable Distance Driver with S-Curve FlightZSCORCH
$17.99/ea
$0.00
$17.99/ea $0.00